Skip to content

Ddareungi listed one works closure and ten festival dock closures

Dock 1693 has an open-ended works notice

Oct 8, 2026

Check the live Ddareungi app before relying on these docks. Passed festival dates do not confirm that rentals and returns resumed.

Dock 1693 has an open-ended works notice. The ten festival-dock start dates have passed, but that does not confirm reopening.

October 8

DockOperator notice
1693 Korea Cancer Center Hospital (원자력 병원)Temporarily closed from October 8 until curb and sidewalk-block work is complete.

Passed October 15 schedule

These six docks were scheduled to close from October 15 until the 31st Gangdong Prehistoric Culture Festival ended. The schedule passing does not confirm reopening.

DockOperator notice
1007 Amsa-dong Prehistoric Site (암사동 선사유적지)Temporary closure was scheduled from October 15.
3539 Seowon Village (서원마을)Temporary closure was scheduled from October 15.
1031 Olympic-ro 836, Arisu-ro (올림픽로 836(아리수로))Temporary closure was scheduled from October 15.
1032 Seonsa High School (선사고등학교)Temporary closure was scheduled from October 15.
4959 Amsa History Park Station Exit 3 (암사역사공원역 3번출구)Temporary closure was scheduled from October 15.
4964 Amsa History Park Station Exit 1 A (암사역사공원역 1번출구 A)Temporary closure was scheduled from October 15.

Passed October 16 schedule

DockOperator notice
1333 in front of Seokgwan Elementary School (석관초등학교 앞)Temporary closure was scheduled until the 8th Uireung Culture Festival ended.
1390 Seokgwan Raemian Artrich (석관래미안아트리치)Temporary closure was scheduled until the 8th Uireung Culture Festival ended.
3206 Mullae-dong Community Service Center (문래동 주민센터)Temporary closure was scheduled until the 13th Mullae Cotton Village Festival ended.
1994 in front of Samsung Electronics Logistics Center (삼성전자 물류센터 앞)Temporary closure was scheduled until the 2nd Guil-dong Saranghae Happy Village Grand Festival ended.

TL;DR

Ddareungi announced rental-and-return changes at 11 docks between October 8 and 16. Dock 1693 received an open-ended construction-closure notice. Ten festival-area docks had scheduled closure starts on October 15 and 16.

Those festival dates have passed, but the operator notices do not confirm that the docks reopened. These are dock-service notices, not nearby cycling-path closures. Check the app before travelling.

Correction: Dock 1157 Gangseo District Office is now scheduled to close permanently on October 30, not October 16. The current operator notice is covered in the October 14 structural service roundup.

Sources

  • Seoul Public Bike Ddareungi: the individual operator notices linked in each table row and the live notice list

More news